RecordSupervisor shift recordConceptual capability
Review pathDraft to publishRecipientNamed supervisorStatusNot representedShift continuity
Responsibility moves. The maintenance context moves with it.
FaultPilot separates the handover of one job from the supervisor handover of an entire shift, while preserving ownership and review history.
Two handover records
The right context for the right recipient.
FaultPilot does not treat every handover as the same object. Job responsibility and shift responsibility have different information and actions.
FP-1001 · HT-214
- From and to
- Priya N. to Sam O.
- Carries
- 2 photos, 1 field note and the next action
Supervisor to next shift supervisor
- Review path
- Draft, review, publish and acknowledge
- Carries
- Selected work, ownership and operating context
Maintainer to named teammate
Job handover
Carry work completed, blockers, next actions, parts, tools and supporting files into an accountable recipient workflow.
- Accept
- Decline
- Reassign
- Acknowledge
Supervisor to next shift supervisor
Shift handover
Prepare, review and publish the shift record with a selected recipient, retained history, acknowledgement and PDF output.
- Draft
- Review
- Publish
- Acknowledge
Job handover evidence
Review before responsibility changes.
Sam O. can review Priya N.'s findings, next actions and supporting files while the handover remains pending.
See the supervisor viewPENDING JOB HANDOVER
FP-1001 · HT-214
- From
- Priya N.
- To
- Sam O.
- Finding
- Moisture observed at connector C17 after wash-down.
- Next action
- Inspect and dry connector C17, verify pin retention, then complete the remaining controlled checks.
- Supporting record
- 2 photos and 1 attributed field note
Continuity evaluationDefine what must move with one job and what the next shift supervisor must review. Read the handover record guide.
Scope the handover standard