Fault records
What a useful mining equipment fault record needs to capture
The record structure that lets a maintainer, incoming crew and supervisor understand the same fault without rebuilding it from memory.
A useful fault record is more than a title and a status. It should let another qualified maintainer understand what was reported, what the machine was doing, what safety boundary applies, what has already been checked and what still requires verification.
The purpose is not to collect every possible field. It is to preserve the information that helps the work continue without creating a second, conflicting version of the fault.
1. Establish the machine and the fault identity
Start with an unambiguous asset identifier, site or area, fault identifier, work order reference where available, reported time and current owner. Model and fleet context can assist later review, but the record still needs a stable machine identity that people can recognise on shift.
Before creating another fault, the maintainer should be able to see whether an active record already exists for the same asset and symptom.
2. Capture the symptom in field language
Record what the machine is doing, when it occurs and the operating conditions around it. Useful context may include whether the event is intermittent, what changed immediately before it, any displayed codes, unusual sounds or smells, and what happens after a restart.
This is a description of the observed event, not a premature root cause. Keeping those separate prevents an early theory from becoming the fault identity.
3. Keep hazards, controls and acknowledgement visible
Task hazards, paired controls and the required acknowledgement should sit before the diagnostic work. If the safety gate has not been acknowledged, the workflow should show that state clearly and keep controlled steps locked.
Software does not determine whether work is safe. The site procedure, machine documentation and authorised people remain the controlling sources.
4. Build a reviewable diagnostic trail
Each check should state what was done, what was found and who recorded it. Measurements, photos and notes should attach to the relevant fault or step. Discarded theories can also matter when they explain why a component or path was ruled out.
The trail should distinguish a completed check from an observation, a proposed action and a verified repair outcome. That distinction becomes important when another shift or supervisor reviews the work.
5. Record ownership changes and the next action
When work moves to another person, record the sender, recipient, current finding, open controls and the next useful action. The recipient should be able to review that context before accepting responsibility. The maintenance handover guide explains what that transfer record should preserve.
A shift handover may also summarise several jobs, but it should still drill back to each source fault rather than becoming a separate narrative.
6. Close with the outcome, not just a completed status
Closeout should capture the repair or action taken, the verification performed, the result and any follow up requirement. Where the available record does not support a reliability measure or root cause conclusion, the product should preserve that limitation instead of filling the gap.
See how these elements move through the maintainer workflow, the handover model and the asset history and review layer.
Follow one record from field to review →